NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

England (NHS healthcare premises); Scotland publishes SHTM 06-01 separately
vHTM 06-01 Electrical services supply and distribution, 2017 edition (PDF dated April 2017); current edition as hosted by NHS England, checked 2026-10-01
11 domains
117 controls

NHS England's guidance on hospital electrical infrastructure: how healthcare organisations govern, design, commission, test and maintain supplies so patients keep power, including standby generator testing (monthly on load, annual at 110%), UPS and Medical IT checks, and the records each needs.

Verified

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) is a compliance framework from England (NHS healthcare premises); Scotland publishes SHTM 06-01 separately with 11 domains and 117 controls that map to 2 other frameworks. The largest domains are Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) (27 controls), Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) (18 controls), Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) (15 controls). Every control below carries what it requires and what an assessor expects to see.

Maintained by Gerard Blokdyk

Framework summaries on this platform are AI-assisted interpretations for educational and compliance planning purposes. They do not reproduce or replace the official standards. Refer to the authoritative source for the definitive text. Framework names and trademarks belong to their respective organisations.

Framework Domains (11)

Appendices – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

1 controls
Controls in the Appendices – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 1 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::App4Appendix 4: Mains extension leads with medical equipment only after competent risk assessment

Chapter 10: Protection and switchgear – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

6 controls
Controls in the Chapter 10: Protection and switchgear – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 6 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::10.1-10.16HV switchgear selection, remote switching and emergency power off intertripping
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::10.17-10.30HV protection design, grading and review on network change
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::10.31-10.48Transformer rating, type, fire compartmentation and temperature monitoring
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::10.49-10.51Generator protection tolerant of faults but clearing local cable faults
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::10.52-10.76LV switchgear location, access control, circuit charts and discrimination study
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::10.77-10.80Network reconfiguration after faults and hard-wired monitored SCADA

Chapter 11: Tertiary power supplies (batteries, UPS, inverters) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

8 controls
Controls in the Chapter 11: Tertiary power supplies (batteries, UPS, inverters) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 8 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.1-11.8Battery selection, environment, charging and temperature alarms
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.10-11.12UPS battery autonomy agreed with clinical stakeholders
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.16-11.18Battery autonomy for emergency lighting, theatre lamps and fire alarms
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.19-11.21Generator starting battery capacity and charging
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.22-11.24Switchgear tripping and closing batteries: 8 hours' autonomy and dual rectifiers
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.25-11.62UPS configuration, protection, alarms and emergency bypass
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.63-11.67Central battery units and theatre lamp inverters
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::11.9-11.15Split battery banks and string monitoring to allow maintenance on line

Chapter 15: Final circuits – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

9 controls
Controls in the Chapter 15: Final circuits – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 9 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.1-15.5No trailing multi-outlet extension leads in Group 1 and 2 locations; enough fixed outlets
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.104-15.119Prefabricated wiring systems and BEMS power supplies
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.14-15.30Medical IT systems in Group 2 locations: monitoring, UPS support and outlet identification
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.31-15.62Patient environment, outlet placement, imaging supplies, theatre panels and emergency power off
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.6-15.13RCD protection and dual circuits with secondary supply backing in Medical Locations
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.63-15.68Continuous supplies, outbuildings, temporary supplies and mobile units
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.69-15.81Lighting circuits: two sources in grade C and above, secondary supply support and circuit identification
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.82-15.97Theatre lights and emergency, safety and standby lighting with automatic testing
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::15.98-15.103Fire alarm, security, nurse call and blood bank alarms: tertiary supplies and failure alarms

Chapter 16: Validation, commissioning and records – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

11 controls
Controls in the Chapter 16: Validation, commissioning and records – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 11 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.1-16.3Adequate time and resources for validation and commissioning
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.12Generator operational tests, fuel storage check, records handed over and DNO witness
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.13-16.16UPS commissioning: changeover, waveform, harmonics, true battery autonomy and alarms
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.17-16.23Medical IT commissioning and validation including changeover times
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.24-16.29Fixed wiring verification to BS 7671 by competent persons, including earthing and phase rotation
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.30-16.32Handover records to be kept
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.33-16.34Operating and maintenance manual with switching philosophy and isolation points
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.35-16.36As-installed drawings and schematics at every HV and LV panel
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.37-16.39Building logbook created or updated
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.4-16.7Generator factory and site testing including static checks and witnessed dynamic tests
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::16.8-16.11Generator voltage regulation, load sharing, parallel operation and PFC isolation verified

Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

27 controls
Controls in the Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 27 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.0-17.8Maintenance duty, responsibility framework and risk-assessed shutdowns
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.102-17.105UPS functional tests at least six-monthly and full service tests
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.106-17.108UPS single-line diagram, site logbook and records of alarms, outages, tests and servicing
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.109-17.118Medical IT inspection, annual functional tests, changeover verification and records
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.11-17.21Response to failures: business continuity plans and 24/7 reporting
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.119-17.127Harmonic filter and power-factor correction maintenance
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.128-17.138Final circuit inspection and full testing every three to five years
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.13-17.17Overall maintenance approach agreed at design with review, safe access and recorded sign-off
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.139-17.140Coordination with dependent services and testing of lighting batteries
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.141-17.147Portable appliance testing regime, asset register and stored test records
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.22-17.28Visual inspection feedback, planned preventive maintenance, audits and condition-based replacement
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.29-17.31Spares strategy and standardised plant; EMC awareness in maintenance
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.32-17.42Switchgear PPM, HV visual inspections every three months, thermal imaging and partial discharge testing
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.43-17.50HV switchgear maintenance programme, operational switching, grading review and secondary injection
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.51-17.62Transformer inspection, annual fluid sampling and earth continuity
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.63-17.71LV switchgear inspection every six months, annual operation of fuse-switches and test records
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.72-17.80Earthing maintenance, annual bonding validation, mobile connections and lightning protection tests
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.81-17.83Monthly on-load generator test of at least one hour including changeover
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.84Load bank testing with reactive and resistive load where on-load testing is not acceptable
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.85-17.86Multi-set test loading above 70% and cooling run-on after tests
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.87-17.91Annual 110% load engine condition test of at least three hours with safety chain tests
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.9-17.10Trained maintenance staff, Authorised Person checks on contractors and safe systems of work
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.90Annual test of automatic transfer switchgear and island-mode tests where cover is below 100%
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.92Reduced test frequency only where parallel operation with the PES exists
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.93-17.95Weekly visual inspection and three-monthly functional tests of primary and secondary supplies
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.96-17.97Single-line diagram of primary and secondary supplies and generator run-hour records
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::17.98-17.101UPS, inverter and battery monthly visual inspection and data log records

Chapter 3: Governance and risk management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

9 controls
Controls in the Chapter 3: Governance and risk management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 9 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.12Security specialist input where IT systems control or monitor electrical plant
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.13-3.17Electrical Safety Group remit, records and minutes
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.18-3.22Risk assessment process, residual risks and periodic review
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.2-3.11Electrical Safety Group: constitution, reporting line and authority
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.23-3.25Contingency where risks are not mitigated, and design for safe maintenance
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.26Departures from HTM 06-01 recorded and justified
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.27Final design and residual risks signed off by all stakeholders
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.3Risk assessments, safe methods of operation and audit of electrical policy
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::3.4Board accountability and contractor participation

Chapter 4: Understanding the risk from loss of supply – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

6 controls
Controls in the Chapter 4: Understanding the risk from loss of supply – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 6 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::4.1Contingency plans for supply failure and relationship with the electricity supplier
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::4.18-4.23Supply restoration times for each clinical risk grade
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::4.2-4.3Design to minimise single points of failure, including failures of the internal network
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::4.24-4.30Business continuity grades: UPS and load management for support services
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::4.31-4.39Distribution strategy driven to agreed residual risk, with resilience for testing and maintenance
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::4.4-4.17Risk grading of areas for loss of supply (clinical A to E, business I to IV)

Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

18 controls
Controls in the Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 18 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.1-9.5Secondary power supply strategy agreed by the Electrical Safety Group
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.12-9.18Secondary supply location and capacity, continuous rating and load shedding schedule
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.19-9.21Areas supported by the secondary supply decided at design with stakeholders
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.22-9.27Generator configuration: N+1 best practice and known failure causes
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.28-9.44Generator operating mode chosen to allow on-load testing (island, short-term or long-term parallel)
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.45-9.53Mains failure detection and automatic start and connection timing
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.54Minimum generator run time of 20 minutes after any start
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.55-9.56Run and stop signals, simulate-mains-failure switches and alarm monitoring
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.57-9.60Multi-set operation, synchronising time and load-dependent set control
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.6-9.31Mobile generator plug-in points: connection, earthing, security and response time
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.61-9.65Mains return delay, load transfer method and cooling run-on
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.66-9.69Load management of generators during prolonged outages
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.7-9.11Renewables run only in parallel with the primary supply, with positive isolation
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.70-9.75Generator, engine and alternator specification: prime rating and load acceptance
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.76-9.80Starting batteries and chargers kept fully charged and monitored
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.81-9.84Fuel storage quantities and fuel quality management
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.85-9.88Fuel transfer, fire dump valves, leak containment and overfill protection
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::9.89-9.92Exhaust, noise, operational safety and controlled disposal of consumables

Chapters 12 to 14: Electromagnetic compatibility, earthing, containment and cables – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

7 controls
Controls in the Chapters 12 to 14: Electromagnetic compatibility, earthing, containment and cables – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 7 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::12.1-12.13EMC compliance of the installation and EMC procurement specification
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::12.14-12.50EMC zoning, cable segregation and earthing practice
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::13.1-13.14Earthing design, HV and LV earth interconnection study and generator earthing
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::13.15-13.32Supplementary bonding and equipotential bonding busbar in Group 1 and 2 locations
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::13.33-13.61Lightning protection to BS EN 62305 and surge protection devices
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::14.1-14.48Containment and cable routes: protection, fire stopping, segregation and HV warnings
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::14.49-14.81Cable sizing, fault calculation for primary and secondary supplies, and identification

Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

15 controls
Controls in the Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) domain of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) — 15 controls
CodeTitle
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::5.0-5.3Early collaboration with the Electrical Safety Group and competent designers
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::5.10-5.31Supply capacity, load assessment and growth allowance
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::5.39-5.42Design for safe access, maintenance and commissioning
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::5.43-5.52Connection of new works to the DNO or the site network
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::5.6Fuel stocks for standby generation maintained
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::5.9Dual, diverse primary supplies where possible
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::6.1-6.19Power quality: power factor, harmonics and generator compatibility
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::7.1-7.13Distribution strategy for resilience and secondary supply provision by risk
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::7.14-7.19Segregated primary and secondary systems, emergency coupling and diverse routes
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::7.20-7.23Two primary connections above 2 MVA and N+1 standby generators kept in readiness
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::7.25-7.68HV and LV network configurations matched to assessed risk
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::8.1-8.20HV substation and LV switchroom location and construction
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::8.21-8.30Access, security and maintenance space in substations and switchrooms
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::8.31-8.36Fire precautions and fire extinguishing in substations
nhs-england-htm-06-01-electrical-services-supply-and-distribution-2017-edition::8.37-8.46Switchroom environment, lighting and minimum equipment and notices

Maps to 2 other frameworks

117 total controls
NFPA 110-2025 Standard for Emergency and Standby Power Systems
45 source controls mapped|39 target controls covered
38%

Coverage is not the same as your position

This page shows what NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) overlaps with in general. Where your organisation actually stands, against the standard you are going for and the certifications you already hold, is a different question. Same graph and the same recorded refutations, scoped to you rather than to a pair.

The Compliance Position Diagnostic, $5,000 fixed, ten business days

What is NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) and who does it apply to?

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) is a compliance framework from England (NHS healthcare premises); Scotland publishes SHTM 06-01 separately with 11 domains and 117 controls. NHS England's guidance on hospital electrical infrastructure: how healthcare organisations govern, design, commission, test and maintain supplies so patients keep power, including standby generator testing (monthly on load, annual at 110%), UPS and Medical IT checks, and the records each needs. It is used by organisations to establish and maintain compliance with industry standards and regulatory requirements.

What does NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) actually require?

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) has 117 controls organised across 11 domains. The largest domains are Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) (27 controls), Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) (18 controls), Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) (15 controls). Each control defines specific requirements that organisations must implement to achieve compliance.

If I already comply with another framework, how much of NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) do I already cover?

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) maps to 2 other compliance frameworks. The top mapping partners are NFPA 110-2025 Standard for Emergency and Standby Power Systems (38% coverage), NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems (7% coverage). Use our comparison tool to explore control-level mappings between frameworks.

How do I implement NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)?

Start your NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) compliance journey by running a self-assessment on our platform to identify your current compliance posture. Our AI advisory can answer specific questions about NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) requirements, and cross-framework mapping helps you leverage existing controls from other frameworks you may already comply with. Create a free account to access all 117 controls and track your progress.

Start Your Compliance Journey

Create a free account to run self-assessments, get AI advisory, and track your compliance progress across 868 frameworks.

Get Started Free →

Free forever — no credit card required