The distribution system may call on standby generators until a fault is cleared, with manual or automatic reconfiguration. Sites with significant grade C or higher areas may benefit from quick reconfiguration using SCADA, and any SCADA used should rely on hard-wired, monitored circuits.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.