NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 10: Protection and switchgear – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 10.77-10.80: Network reconfiguration after faults and hard-wired monitored SCADA

The distribution system may call on standby generators until a fault is cleared, with manual or automatic reconfiguration. Sites with significant grade C or higher areas may benefit from quick reconfiguration using SCADA, and any SCADA used should rely on hard-wired, monitored circuits.