A comprehensive O&M manual covering all plant, switchgear and protection should be provided at handover or during commissioning, describing how the design meets the strategy and how it is meant to operate, the switching philosophy, cause and effect scenarios, local operating procedures including load shedding when changing between PES, generators and tertiary supplies, and diagrams of all points of isolation with panel and room references.