NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 17.13-17.17: Overall maintenance approach agreed at design with review, safe access and recorded sign-off

Operation and maintenance should follow the organisation's operational policies and HTM 06-02 and 06-03 safety procedures. The approach to maintenance should be settled and approved during design of a new build, extension or change of management responsibility, with a defined review period to capture lessons. There should be safe access and space around all plant. After maintenance the work should be inspected visually and the documentation signed off and recorded in the planned maintenance system.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.3.3 8.3.3 Written maintenance and testing schedule

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.