Staff should be encouraged to report early warnings (temperature, noise, vibration, smell, status lights, gauges), including unauthorised extension leads in Group 1 and 2 locations. A planned preventive maintenance programme should be based on knowledge of the network and services supported and set frequency, content, skills and impact on care, defining permits or limitations of access. Maintenance audits should show whether statutory obligations are met and drive improvement. Test results, condition observations, performance and parts replaced should be recorded; task completion recorded and repeated non-completions reviewed and reported to management; records kept for trend analysis and used to inform replacement schedules.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.