NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 17.90: Annual test of automatic transfer switchgear and island-mode tests where cover is below 100%

Generator maintenance should test, once a year, any automatic switchgear transferring supply between PES and secondary supply. Where the secondary supply does not give the recommended 100% coverage, tests should include island-mode runs with the PES isolated, so staff learn the secondary supply's limits and exercise their contingency plans.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.