NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 17.84: Load bank testing with reactive and resistive load where on-load testing is not acceptable

Long-term paralleling with the PES under G59/3-2 minimises disruption. Without it, testing on building load needs a short supply interruption which may be unacceptable, so tests should then use a load bank with reactive and resistive components; purely resistive load banks may damage cylinders and liners through carbon build-up.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.4.2.3 8.4.2.3 Annual supplemental load test

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.