NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 9.19-9.21: Areas supported by the secondary supply decided at design with stakeholders

Secondary supplies should always be able to power the areas that let the facility keep essential functions going and keep patients safe; those areas are to be fixed during design with all stakeholders including the Group, using the risk grades. Phased developments should design in the final secondary supply where practicable. For island-mode generators serving only segregated essential services, a four-pole main autochangeover rated for the full load is required: normally the DNO feeds the essential board through the main switchboard, and in an emergency the generator feeds only the essential board.

Maintained by Gerard Blokdyk

Other controls in Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.