NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 8.37-8.46: Switchroom environment, lighting and minimum equipment and notices

Internal substations and switchrooms should have maintained lighting averaging 200 lux, escape lighting of 15 lux for 3 h supported by a secondary source, temperature kept above 10 C and within equipment limits, humidity controlled (it promotes partial discharge) and transformer heat removed, naturally where possible. As a minimum they should hold safety posters (including first aid and electric shock treatment), current single-line diagrams and, at the intake substation, a mimic board, a key cabinet with the site logbook, a sign identifying the LV earthing system (also at each final distribution board and MCC), a battery charger for trip circuits with on-load test facility, storage for tools and test equipment and fixed lifting equipment.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 7.3 7.3 Lighting at the EPS location
  • 7.7 7.7 Heating, cooling and ventilating

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.