Enough fuel for standby generators and CHP plant needs to be held, in line with HBN 00-07 on resilience planning; UPS and battery supplies are only short-term measures and need a resilient primary and secondary network behind them.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.