NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 5.6: Fuel stocks for standby generation maintained

Enough fuel for standby generators and CHP plant needs to be held, in line with HBN 00-07 on resilience planning; UPS and battery supplies are only short-term measures and need a resilient primary and secondary network behind them.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.