Secondary supplies may be generators, CHP or rotary or static UPS, and DNO arrangements influence maintenance. Every standby generator should run on line carrying the building load once a month, for at least one hour and preferably two, and the test should include the interlock and changeover arrangements; how the test is started depends on the distribution strategy.