NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 17.85-17.86: Multi-set test loading above 70% and cooling run-on after tests

Where several generators serve the same distribution with long-term parallel arrangements, not all need testing at once, but sets on test should run above 70% of full load by adjusting load sharing so the generator leads and the PES supplements. Starting the second set after about an hour of the first, synchronising it before loading, then stopping the first after a further 15 minutes is advantageous. After a test the generator should run on off line for 10 minutes for its cooling system to stabilise.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.4.3-8.4.5 8.4.3 to 8.4.5 Test initiation, cold starts and time delay settings

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.