Chapter 16: Validation, commissioning and records – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 16.8-16.11: Generator voltage regulation, load sharing, parallel operation and PFC isolation verified

Terminal voltage should stay within plus or minus 2.5% across the range no load to 110%, overshoot on starting by no more than 15% and recover within 3% in 0.15 s; a step from no load to 60% should cause no more than 15% deviation, recovering within 3% in 0.5 s. Parallel sets should share load equally at equal speeds; for PES-parallel sets the governor should track supply frequency and the overspeed protection should cut fuel at 110%. Isolation of power-factor correction when generators supply the load should be shown during commissioning.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 7.13.4 7.13.4 Conduct of the on-site acceptance test

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.