Terminal voltage should stay within plus or minus 2.5% across the range no load to 110%, overshoot on starting by no more than 15% and recover within 3% in 0.15 s; a step from no load to 60% should cause no more than 15% deviation, recovering within 3% in 0.5 s. Parallel sets should share load equally at equal speeds; for PES-parallel sets the governor should track supply frequency and the overspeed protection should cut fuel at 110%. Isolation of power-factor correction when generators supply the load should be shown during commissioning.