Electrical failure can happen anywhere regardless of design standard, so suitable risk management and practical emergency contingency plans should always be ready to use, and the design should maintain supply within the time bands patients and staff need (more than 15 s, 15 s to 5 s, 5 s to 0.5 s, under 0.5 s, no-break). Organisations should establish a formal link with the electricity supplier, possibly by registering for priority user status with a nominated client manager.