The source of run and stop signals should be clear so the set runs automatically whenever mains fails at any point it is meant to supply. Where any switch for simulating a mains failure, and any push button for returning to mains, is placed should be decided for the whole system and the operator's needs. Maintenance and testing opportunities affect control requirements (redundant sets need sequencing controls; parallel operation lets tests run without loss of supply), and BMS monitoring of every generator alarm should be considered.