NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 5.0-5.3: Early collaboration with the Electrical Safety Group and competent designers

Whatever the procurement route, the design team should engage the Electrical Safety Group from the start of design, before any fundamental infrastructure decisions, with regular progress meetings convened by the Group's chair. Under the CDM Regulations organisations should engage only designers and installers with the skills, knowledge and experience for their role, and the design should identify areas needing special treatment, such as Medical Locations Group 0, 1 and 2.

Maintained by Gerard Blokdyk

Other controls in Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.