Generating plant should be proved as one complete system with its control panel, to BS ISO 3046, BS EN 60034 and BS 7698. The maker should run a full factory test, with a reactive and resistive load bank, witnessed by the project engineer where possible. Before dynamic site tests: lubrication and cooling filtered and sealed, filters replaced before handover, crankshaft deflection recorded, stator insulation checked against type tests with a polarisation index of at least 2, control circuit insulation measured, and installed plant checked against contract with indications and alarms. Witnessed dynamic tests include starting inside the specified time, the overspeed trip, speed and voltage regulation, protection trips, a full-load run of at least 4 hours followed by 1 hour at 10% overload and a full-load protection trip, and records of fuel, temperatures, exhaust, noise and ambient conditions.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.