Some ME equipment needs supply even when switched off (MRI, gamma cameras, digital X-ray) and this should be designed for. Annexes and plantrooms should be installed to the same standard as the main building, and temporary supplies to the same standard as permanent ones. Connections for mobile treatment units such as MRI trailers should protect accessible cables and switchgear and follow BS 7671 Sections 717 and 710.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.