A single-line diagram showing the UPS and inverter set-up should be installed next to the UPS showing its connection to the infrastructure and maintenance, as part of the O&M manual and site logbook. The logbook should give full details of UPS, inverters and batteries including battery sizes and string voltages. Records should be kept of all UPS alarms and outages and all tests and servicing, ideally on a standard form.
This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.