NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 17.96-17.97: Single-line diagram of primary and secondary supplies and generator run-hour records

A simple single-line diagram showing how every primary and secondary supply and its controls interface, including earthing arrangements when supplied from the secondary source, should be available at all times. Every hour a standby generator runs should be logged, whether for testing, parallel operation or PES outage.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.