NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 17.102-17.105: UPS functional tests at least six-monthly and full service tests

UPS, inverter and battery functional tests should be done at most every six months, including physical testing of connected alarms, verifying transfer from rectifier to battery within 0.5 s and static switch operation within 0.5 s on inverter fault, and no-break performance where required. Self-diagnostic tests can supplement. Full-service tests should show batteries hold charge on bypass, test the UPS on line with mains disconnected monitoring discharge voltage and current over at least 10 minutes, observe recharge, verify rectifier, inverter, static and bypass switches, tighten connections and verify waveforms.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.4.3 8.4.3 Load testing and ohmic trending
  • 8.4.4 8.4.4 Annual load test

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 17: Maintenance and operational management – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.