NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 5.9: Dual, diverse primary supplies where possible

For higher resilience, premises should where possible have two primary supplies (ideally each rated at 100%) with automatic or manual changeover, made diverse by coming from different DNO substations, preferably supplied from different parts of the grid, with separate cable routes into and around the site; for larger premises two separate HV feeders should be considered.

Maintained by Gerard Blokdyk

Other controls in Chapters 5 to 8: Design, power quality, distribution strategy and primary power centres – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.