NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)
Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)

NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition) 9.6-9.31: Mobile generator plug-in points: connection, earthing, security and response time

Strategically placed mobile generator plug-in points may support maintenance of fixed sets; designers should consider the hook-up location and long cables, and mobile generators should be physically secured. Where used, the realistic time to obtain and connect a set (especially if hired) should be weighed against clinical risk; managers should consider owning a unit or arranging short-notice hire, and a dedicated fenced position is desirable. Connection should follow ENA G.84, may use a BS EN 60309 plug-in up to 175 kVA, with separate earth leads to the star point and metalwork and an earth bar for the base plate. The ESQCR do not allow a mobile generator to back-feed the public network, so positive isolation from the PES is essential before and during its use.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.1.1-8.1.2 8.1.1 and 8.1.2 Basis of the maintenance and testing programme

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 9: Secondary power centres and plant (standby generators) – NHS England HTM 06-01 Electrical Services Supply and Distribution (2017 Edition)