ISO 45001:2018
Operation – ISO 45001:2018

ISO 45001:2018 8.2: Emergency preparedness and response

The organization sets up, runs and keeps the processes it needs to get ready for, and respond to, possible emergencies identified under 6.1.2.1. This includes: setting a planned response, first aid included; training people in that response; testing and exercising the capability to respond at intervals; assessing how the response performed and revising it after tests and after real emergencies; telling workers what their duties and responsibilities are; passing relevant information, as appropriate, to contractors, visitors, emergency services, government authorities and the local community; and, when the planned response is developed, taking account of what every relevant interested party needs and is able to do. Documented information on the processes and the plans is kept.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 40 controls across 21 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • FV-GFS 20.01.02 FV-GFS 20.01.02 The farm has health and safety procedures.
  • FV-GFS 20.02.01 FV-GFS 20.02.01 Accident and emergency procedures are displayed and communicated.
  • FV-GFS 20.02.03 FV-GFS 20.02.03 First aid kits are accessible at all permanent sites and fields near the work.
  • FV-GFS 20.02.04 FV-GFS 20.02.04 There is always at least one person trained in first aid present on the farm whenever on-farm activities are being carried out.
  • FV-GFS 32.10.03 FV-GFS 32.10.03 An accident procedure is available near the plant protection product (PPP)/chemical storage.
  • FV-GFS 32.10.04 FV-GFS 32.10.04 Facilities are available to deal with operator contamination.
  • CAB 3.2 CAB 3.2 Cabin Crew Policies and Procedures
  • CAB 4.1 CAB 4.1 Preflight Inspection/Non-serviceable Equipment Reporting
  • DSP 3.7 DSP 3.7 Emergency Response
  • FLT 3.14 FLT 3.14 Non-Normal/Abnormal and Emergency Operations
  • GRH 3.6 GRH 3.6 Airside Event Response and Reporting
  • ORG 1.7 ORG 1.7 Emergency Response
  • 6.2.4 6.2.4 Protocols to address emergencies and incidents that generate heightened concern
  • 8.9.1 8.9.1 General considerations in pre-planning
  • 8.9.2 8.9.2 Immediate response critical considerations
  • 10.2 10.2 Train for rescues: immediate start, frequency set by competence, no risk to rescuers
  • 10a 10 Establish and test emergency and rescue procedures where fall arrest is used (r 80)
  • 10b 10 Provide first aid equipment, facilities and trained first aiders (r 42)
  • r42 r 42 Provide first aid equipment, facilities and trained first aiders
  • r43 r 43 Prepare, maintain, test and implement an emergency plan
  • r557 r 557 Prepare, consult on, share, test and implement the MHF emergency plan
  • K-ep Appendix J and K: Prepare, maintain, test and implement an emergency plan (r 43)
  • K-fa Appendix J and K: First aid equipment, facilities and trained first aiders (r 42)

ISO 22000:2018 · 2 controls

  • 8.2 Prerequisite programmes (PRPs)
  • 8.4 Emergency preparedness and response
  • ISO-39001-8.2 Emergency preparedness and response
  • ISO39001-8.2 Emergency Preparedness and Response

ISO 14001:2015 · 1 control

  • 8.2 Emergency preparedness and response

ISO 22301:2019 · 1 control

  • 8.2 Business impact analysis and risk assessment

ISO 27701:2019 · 1 control

  • 8.2 Conditions for collection and processing
  • ISO28001-4.11 Emergency preparedness and response

ISO 37001:2016 · 1 control

  • 8.2 8.2 Due diligence

ISO 37301:2021 · 1 control

  • 8.2 Establishing controls and procedures
  • ISO41001-8.5 Emergency Preparedness and Response

ISO 45003:2021 · 1 control

  • 8.2 8.2 Emergency preparedness and response

ISO 55001:2014 · 1 control

  • 8.2 Management of change

ISO 9001:2015 · 1 control

  • 8.2 Requirements for products and services

ISO/IEC 42001:2023 · 1 control

  • 8.2 AI risk assessment
  • WELL-COMM-02 Emergency Preparedness

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Operation – ISO 45001:2018

Query this from an agent

The graph holds this control, the 40 it maps to, and the evidence behind each claim, over MCP and REST.