Before any planned change is made, whether temporary or permanent, that could affect whether the asset management objectives are met, its risks are assessed, and the organization makes sure those risks are handled as 6.1 and 6.2.2 require. It controls changes it has planned and reviews the consequences of changes that were not intended, acting where needed to limit any adverse effects.
This control maps to 23 controls across 19 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
ISO 55001:2014 8.2 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of ISO 55001:2014 your existing evidence covers. Hold ISO 55001:2024 and 27 of 27 ISO 55001:2014 controls already carry evidence.
Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the ISO 55001:2024 pair alone.
The graph holds this control, the 23 it maps to, and the evidence behind each claim, over MCP and REST.