ISO 45001:2018
Operation – ISO 45001:2018

ISO 45001:2018 8.1.3: Management of change

The organization sets up processes to put in place, and keep under control, planned changes, temporary or permanent, that affect OH&S performance. These include: new products, services and processes, or alterations to existing ones (such as where workplaces are and what surrounds them, how work is organized, working conditions, equipment and the workforce); changes to legal and other requirements; new knowledge or information about hazards and risks; and advances in knowledge and technology. It looks at what unintended changes lead to and acts, as needed, to limit any harmful effects.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 16 controls across 12 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • r352 r 352 Review chemical control measures on specified triggers and at least every 5 years
  • r38 r 38 Review and revise control measures, including on an HSR's request
  • r401 r 401 Review lead control measures on specified triggers
  • 3.4 3.4 Maintain and review controls, and revise the SWMS and WHS management plan with them (rr 37, 38)
  • 4.4 4.4 Review and revise the SWMS with workers when controls change (r 302)

AICPA SOC 3 · 1 control

  • SOC3-CHANGE-MGT Change Management
  • 3.4e 3.4 Review and revise fall controls when triggered (r 38)
  • AESCSF-ACM-3 Change management

IEC 62443 · 1 control

  • 62443-2-1-MOC Management of Change for IACS Security
  • ISO-26262-8-8 Change management

ISO 27002:2022 · 1 control

  • 8.32 Change management

ISO 27018:2019 · 1 control

  • 12.1.2 Change management

ISO 45003:2021 · 1 control

  • 8.1.3 8.1.3 Management of change

ISO 55001:2014 · 1 control

  • 8.2 Management of change

PCI SSF · 1 control

  • SSLC-9.1 Change Management

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Operation – ISO 45001:2018

Query this from an agent

The graph holds this control, the 16 it maps to, and the evidence behind each claim, over MCP and REST.