ISO 45001:2018
Operation – ISO 45001:2018

ISO 45001:2018 8.1.2: Eliminating hazards and reducing OH&S risks

What does 8.1.2 require?

The organization sets up, runs and keeps processes for removing hazards and lowering OH&S risks by working down the hierarchy of controls: first remove the hazard; next replace it with processes, operations, materials or equipment that are less hazardous; then apply engineering controls and reorganize the work; then apply administrative controls, training included; and finally provide personal protective equipment that is adequate.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 40 controls across 9 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • WELL-AIR Air Concept: Indoor Air Quality
  • WELL-AIR-02 Smoke-Free Environment
  • WELL-LIGHT-01 Light Concept: Visual Lighting Design
  • WELL-LIGHT-02 Circadian Lighting Design
  • WELL-MIND-01 Mind Concept: Mental Health Support
  • WELL-MIND-02 Stress Management and Resilience
  • WELL-SOUND-01 Sound Concept: Acoustic Performance
  • WELL-THERMAL-01 Thermal Comfort Concept
  • WELL-WATER-01 Water Concept: Drinking Water Quality
  • WELL-WATER-02 Legionella Management
  • WELLV-1 Air, Water, Nourishment
  • WELLV-2 Light, Movement, Thermal Comfort
  • WELLV-3 Sound, Materials
  • FV-GFS 20.01.02 FV-GFS 20.01.02 The farm has health and safety procedures.
  • FV-GFS 20.02.02 FV-GFS 20.02.02 Safety advice for substances hazardous to workers’ health and safety is immediately available and accessible.
  • FV-GFS 20.03.01 FV-GFS 20.03.01 Workers, visitors, and subcontractors are equipped with suitable personal protective equipment (PPE).
  • FV-GFS 20.03.02 FV-GFS 20.03.02 Personal protective equipment (PPE) is maintained in clean conditions and stored appropriately so as not to pose any contamination risk to personal items.
  • FV-GFS 20.03.03 FV-GFS 20.03.03 There is evidence that the provided personal protective equipment (PPE) is used by the workers.
  • FV-GFS 20.04.04 FV-GFS 20.04.04 Transportation provided to workers is safe.
  • FV-GFS 32.10.06 FV-GFS 32.10.06 The farm has documented procedures addressing re-entry times after plant protection product (PPP) application.
  • 6.2.6 6.2.6 High-risk workplaces
  • 8.4 8.4 Actions by the Threat Management Team
  • 8.5.2 8.5.2 Actions involving the potential victim or target
  • 1.7a 1.7 Manage construction risks, physical and psychosocial, through the hierarchy of control (rr 297, 32 to 38)
  • 3.3a 3.3 Eliminate construction risks, then minimise by substitution, isolation and engineering
  • 3.3b 3.3 Administrative controls and PPE only after higher controls, or to add protection
  • 2.1 2.1 Eliminate or minimise fall risks at the design stage
  • 3.4a 3.4 Manage fall risk: work on the ground or a solid construction and provide safe access and exit (r 78)
  • 3.4b 3.4 Minimise remaining fall risk through the ordered controls (r 79)
  • r35 r 35 Eliminate risks, or minimise them, so far as is reasonably practicable
  • r36 r 36 Apply the hierarchy of control measures
  • r79 r 79 Where a fall risk remains: fall prevention device, then work positioning, then fall arrest
  • s17 s 17 Management of risks: eliminate, or if not reasonably practicable minimise
  • s22(2) s 22(2) Designers: design plant, substances and structures to be without risks

ISO 45003:2021 · 2 controls

  • 8.1.2 8.1.2 Eliminating hazards, reducing OH&S risks and promoting well-being at work
  • 8.3 8.3 Rehabilitation and return to work

ISO/DIS 45001:2026 · 2 controls

  • 8.1.2 Eliminating hazards and reducing OH&S risks
  • 8.1.3 Occupational health

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.