Back to Frameworks

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

International (SAE S-18 with EUROCAE WG-63); used for type certification under 14 CFR and EASA CS
vSAE ARP4754 Revision B (revised 2023-12, superseding ARP4754A of 2010-12); EUROCAE ED-79B word-for-word equivalent
7 domains
79 controls

SAE's recommended practice for developing civil aircraft and their systems under development assurance: planning and certification coordination, aircraft and system functions, architecture and allocation to items, information flows with software and hardware processes, integration and the search for unintended behaviors, the safety assessment interface and development assurance level assignment, requirements capture including derived and safety requirements, requirements validation with assumption management and validation matrices, implementation verification, configuration management, process assurance and modifications.

Verified

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems is a compliance framework from International (SAE S-18 with EUROCAE WG-63); used for type certification under 14 CFR and EASA CS with 7 domains and 79 controls that map to 2 other frameworks. The largest domains are Sections 5.3 and 5.4: Requirements capture and requirements validation – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems (27 controls), Sections 5.1 and 5.2: Safety assessment and development assurance level assignment – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems (15 controls), Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems (14 controls). Every control below carries what it requires and what an assessor expects to see.

Maintained by Gerard Blokdyk

Framework summaries on this platform are AI-assisted interpretations for educational and compliance planning purposes. They do not reproduce or replace the official standards. Refer to the authoritative source for the definitive text. Framework names and trademarks belong to their respective organisations.

Framework Domains (7)

Appendix A: Process objectives data – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

1 controls
Controls in the Appendix A: Process objectives data – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 1 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::A.1A.1 Process objectives, outputs and applicability by development assurance level

Section 3: Development assurance planning – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

6 controls
Controls in the Section 3: Development assurance planning – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 6 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::3.13.1 Development assurance planning process and planning elements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::3.23.2 Development assurance plan
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::3.2.13.2.1 Design description
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::3.2.23.2.2 Transition criteria
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::3.2.33.2.3 Deviations from plans
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::3.33.3 Certification Authority coordination

Section 4: Aircraft and system development process – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

11 controls
Controls in the Section 4: Aircraft and system development process – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 11 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.24.2 Aircraft function and requirement development
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.34.3 Development of aircraft architecture and allocation of aircraft functions to systems
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.44.4 Development of system functions and requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.54.5 Development of system architecture and allocation of system requirements to items
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.6.1.14.6.1.1 Information flow from the system process to the item processes
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.6.1.24.6.1.2 Information flow from the item processes to the system process
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.6.1.34.6.1.3 Information flow between hardware and software life cycle processes
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.6.24.6.2 Item design and build
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.6.34.6.3 Item integration and verification
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.6.44.6.4 Aircraft and system integration and verification, including unintended behaviors
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::4.74.7 Summary of development assurance process outputs

Section 6: Modifications to aircraft or systems – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

5 controls
Controls in the Section 6: Modifications to aircraft or systems – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 5 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::6.16.1 Modification and reuse process overview
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::6.26.2 Modification management process
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::6.36.3 Modification impact analysis
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::6.46.4 Reuse of evidence from previous certification
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::6.4.16.4.1 Use of service history

Sections 5.1 and 5.2: Safety assessment and development assurance level assignment – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

15 controls
Controls in the Sections 5.1 and 5.2: Safety assessment and development assurance level assignment – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 15 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.15.1 Safety assessment process
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.15.1.1 Aircraft functional hazard assessment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.25.1.2 Preliminary aircraft safety assessment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.35.1.3 System functional hazard assessment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.45.1.4 Preliminary system safety assessment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.55.1.5 System safety assessment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.65.1.6 Aircraft safety assessment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.75.1.7 Safety program plan
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.1.85.1.8 Safety-related flight operations or maintenance tasks
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.2.15.2.1 General principles of development assurance level assignment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.2.25.2.2 FDAL and IDAL
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.2.35.2.3 Detailed FDAL and IDAL assignment
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.2.3.25.2.3.2 FDAL assignment with architecture consideration and functional failure sets
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.2.3.2.15.2.3.2.1 Independence attributes
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.2.3.2.25.2.3.2.2 FDAL and IDAL assignment process

Sections 5.3 and 5.4: Requirements capture and requirements validation – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

27 controls
Controls in the Sections 5.3 and 5.4: Requirements capture and requirements validation – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 27 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.35.3 Requirements capture planning and modeling
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.15.3.1.1 Safety requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.105.3.1.10 Derived requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.115.3.1.11 Reuse of systems, equipment or items from previously certificated products
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.25.3.1.2 Functional requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.35.3.1.3 Customer requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.45.3.1.4 Operational requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.55.3.1.5 Performance requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.65.3.1.6 Physical and installation requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.75.3.1.7 Maintainability requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.85.3.1.8 Interface requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.1.95.3.1.9 Certification requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.25.3.2 Capturing safety requirements from the safety analyses
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.35.3.3 Identifying and evaluating derived requirements
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.3.45.3.4 Capturing maintenance requirements for in-service use
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.45.4 Requirements validation
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.15.4.1 Validation process objectives
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.25.4.2 Validation process and validation plan
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.2.35.4.2.3 Correctness and completeness
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.2.45.4.2.4 Management of assumptions
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.2.55.4.2.5 Validation matrix
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.2.65.4.2.6 Validation summary
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.35.4.3 Correctness checks
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.45.4.4 Completeness checks
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.55.4.5 Validation approach
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.65.4.6 Validation methods
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.4.75.4.7 Validation data

Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

14 controls
Controls in the Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems domain of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems — 14 controls
CodeTitle
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.5.15.5.1 Verification process objectives
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.5.25.5.2 Verification process
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.5.35.5.3 Verification approach
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.5.45.5.4 Verification planning
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.5.55.5.5 Verification methods
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.5.65.5.6 Verification data
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.6.15.6.1 Configuration management process objectives
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.6.25.6.2 Configuration management process activities
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.6.35.6.3 Configuration management data
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.6.45.6.4 System control categories
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.7.15.7.1 Process assurance objectives
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.7.25.7.2 Process assurance plan
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.7.35.7.3 Process assurance reviews
sae-arp4754b-ed-79b-guidelines-for-development-of-civil-aircraft-and-systems::5.7.45.7.4 Process assurance data

Maps to 2 other frameworks

79 total controls
DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware
46 source controls mapped|37 target controls covered
58%
DO-178C / ED-12C - Software Considerations in Airborne Systems
19 source controls mapped|18 target controls covered
24%

Coverage is not the same as your position

This page shows what SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems overlaps with in general. Where your organisation actually stands, against the standard you are going for and the certifications you already hold, is a different question. Same graph and the same recorded refutations, scoped to you rather than to a pair.

The Compliance Position Diagnostic, $5,000 fixed, ten business days

What is SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems and who does it apply to?

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems is a compliance framework from International (SAE S-18 with EUROCAE WG-63); used for type certification under 14 CFR and EASA CS with 7 domains and 79 controls. SAE's recommended practice for developing civil aircraft and their systems under development assurance: planning and certification coordination, aircraft and system functions, architecture and allocation to items, information flows with software and hardware processes, integration and the search for unintended behaviors, the safety assessment interface and development assurance level assignment, requirements capture including derived and safety requirements, requirements validation with assumption management and validation matrices, implementation verification, configuration management, process assurance and modifications. It is used by organisations to establish and maintain compliance with industry standards and regulatory requirements.

What does SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems actually require?

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems has 79 controls organised across 7 domains. The largest domains are Sections 5.3 and 5.4: Requirements capture and requirements validation – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems (27 controls), Sections 5.1 and 5.2: Safety assessment and development assurance level assignment – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems (15 controls), Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems (14 controls). Each control defines specific requirements that organisations must implement to achieve compliance.

If I already comply with another framework, how much of SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems do I already cover?

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems maps to 2 other compliance frameworks. The top mapping partners are DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware (58% coverage), DO-178C / ED-12C - Software Considerations in Airborne Systems (24% coverage). Use our comparison tool to explore control-level mappings between frameworks.

How do I implement SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems?

Start your SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems compliance journey by running a self-assessment on our platform to identify your current compliance posture. Our AI advisory can answer specific questions about SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems requirements, and cross-framework mapping helps you leverage existing controls from other frameworks you may already comply with. Create a free account to access all 79 controls and track your progress.

Start Your Compliance Journey

Create a free account to run self-assessments, get AI advisory, and track your compliance progress across 868 frameworks.

Get Started Free →

Free forever — no credit card required