Modifications to aircraft or systems, including reuse of systems, equipment and items from previously certificated products, are handled through the development assurance planning process (3), with the scope of each development identifying the modification or reuse involved; Revision B rewrote this section to reflect the change categories used in industry, reuse included.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.