SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems
Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems 5.7.1: 5.7.1 Process assurance objectives

Process assurance, performed with independence from the development process, gives assurance that the plans needed for all aspects of certification are developed and maintained, that development activities and processes are carried out in line with those plans, and that its own outputs are produced and controlled as Appendix A sets out.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A-9.2 Quality assurance confirms the processes follow the approved plans

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.