SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems 5.5.2: 5.5.2 Verification process

Verification is carried out at every level of the hierarchy against the aircraft, system and item requirements, using the verification plan, procedures and the verification matrix, with problems found during verification captured as problem reports and fed back into the development and integral processes.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.