SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems
Appendix A: Process objectives data – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems A.1: A.1 Process objectives, outputs and applicability by development assurance level

Appendix A tabulates the process objectives with, for each, the outputs that evidence it, the system control category of each output and its applicability by FDAL (for example recommended, recommended with process independence, as negotiated, or not required), across planning, aircraft and system development and requirements capture, safety assessment, requirements validation (including that requirements are complete and correct, assumptions and derived requirements justified and validated, and requirements traceable), implementation verification, configuration management and process assurance. Revision B revisited the objectives and their wording; the prior-edition table is held for comparison.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A Appendix A Modulation of life cycle data by design assurance level, and verification independence

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.