SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems
Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems 5.5.3: 5.5.3 Verification approach

The verification approach is set according to the development assurance level, defining the independence between design and verification activities required at each level and the combination and coverage of verification methods to be applied, with Revision B allowing more flexibility in the choice of methods than the prior edition.

Maintained by Gerard Blokdyk

Other controls in Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.