SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems
Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems 5.7.4: 5.7.4 Process assurance data

Process assurance data are the evidence of process assurance: review records, findings and actions, and their tracking to resolution on an agreed schedule, which are referenced in the development assurance summary.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 10.8 10.8 Hardware process assurance records

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.