Verification planning identifies the verification activities and their sequence, the key verification setups and dependent activities, the configuration to be tested, the test setup and any special hardware or software, the conditions under which hardware or software verification may be credited toward system verification, and the process for re-verifying (for example regression testing) after requirement or design changes made once a verification baseline exists.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.