SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems
Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems 5.5.4: 5.5.4 Verification planning

Verification planning identifies the verification activities and their sequence, the key verification setups and dependent activities, the configuration to be tested, the test setup and any special hardware or software, the conditions under which hardware or software verification may be credited toward system verification, and the process for re-verifying (for example regression testing) after requirement or design changes made once a verification baseline exists.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Sections 5.5 to 5.7: Implementation verification, configuration management and process assurance – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.