SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems
Section 3: Development assurance planning – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems 3.2.2: 3.2.2 Transition criteria

Planning establishes life cycle checkpoints and reviews aligned with programme phases and gates, defines the maturity expected at each so that progress and integration state of design, implementation and certification are visible, states the technical and process entry and exit criteria, and tracks and manages any issue left open when moving from one development phase to the next.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A-1.2 Life cycle model fixed: process interactions, order, feedback and transition criteria

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 3: Development assurance planning – SAE ARP4754B / ED-79B - Guidelines for Development of Civil Aircraft and Systems

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.