ISO 9001:2015
Performance evaluation – ISO 9001:2015

ISO 9001:2015 9.1.1: General

What does 9.1.1 require?

The organization decides what it will monitor and measure; which methods of monitoring, measurement, analysis and evaluation it will use so the results can be relied on; when monitoring and measurement take place; and when the results are analysed and evaluated. It evaluates how the QMS is performing and how effective it is, and retains suitable documented information showing those results.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 67 controls across 48 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

COBIT 2019 · 3 controls

  • APO09.04 APO09.04 Monitor and report service levels
  • APO11.04 APO11.04 Perform quality monitoring, control and reviews
  • MEA01.01 MEA01.01 Establish a monitoring approach

ISO 22000:2018 · 3 controls

  • 10.1 Nonconformity and corrective action
  • 9.1 Monitoring, measurement, analysis and evaluation
  • 9.1.1 General

ISO 45001:2018 · 3 controls

  • 10.2 Incident, nonconformity and corrective action
  • 9.1 Monitoring, measurement, analysis and performance evaluation
  • 9.1.1 General
  • IEC62304-4.1 Quality Management System
  • IEC62304-9.6 Analyze Problems for Trends

ISO 10002:2018 · 2 controls

  • 8.1 8.1 Collection of information
  • 8.4 8.4 Monitoring of the complaints-handling process

ISO 14001:2015 · 2 controls

  • 9.1 Monitoring, measurement, analysis and evaluation
  • 9.1.1 General

ISO 21001:2018 · 2 controls

  • 9.1.1 9.1.1 General
  • 9.1.4 9.1.4 Methods for monitoring, measurement, analysis and evaluation

ISO 21001:2025 · 2 controls

  • 9.1.1 9.1.1 General
  • 9.1.4 9.1.4 Methods for monitoring, measurement, analysis and evaluation

ISO 37301:2021 · 2 controls

  • 9.1 Monitoring, measurement, analysis and evaluation
  • 9.1.1 Monitoring, measurement, analysis and evaluation: general
  • ISO-17025-8.1 Options
  • ISO-17025-8.7 Corrective actions

ISO/IEC 27003:2017 · 2 controls

  • NFPA1600-7.2 After-Action Reporting
  • NFPA1600-8.2 Corrective Action
  • AS9100D-10.2 Nonconformity and Corrective Action
  • ACQS-8-3 Continuous Improvement
  • OS4.4 Standard 4.4 Systematic monitoring, evaluation and continuous improvement
  • DIQ-2 Data Quality Management
  • IS.AR.210 Findings and Corrective Actions

ISO 13485:2016 · 1 control

  • 4.1 General requirements

ISO 14004:2016 · 1 control

  • 8.1.1 General guidance: Operational control
  • ISO-14064-1-8 Quality management of the GHG inventory
  • ISO-20400-6.5 Monitoring and continuous improvement

ISO 22301:2019 · 1 control

  • 9.1 Monitoring, measurement, analysis and evaluation

ISO 27005:2022 · 1 control

ISO 27701:2019 · 1 control

  • 5.7.1 Monitoring, measurement, analysis and evaluation

ISO 30401 · 1 control

  • ISO30401-15 Nonconformity and corrective action

ISO 37001:2016 · 1 control

  • 9.1 9.1 Monitoring, measurement, analysis and evaluation
  • ISO-39001-10.1 Nonconformity and corrective action
  • ISO-41001-10.1 Nonconformity and corrective action

ISO 55001:2014 · 1 control

  • 9.1 Monitoring, measurement, analysis and evaluation

ISO 56002 · 1 control

  • ISO-56002-10.2 Deviation, nonconformity and corrective action

ISO/IEC 27014:2020 · 1 control

  • 27014-5.6 Continuous improvement

ISO/IEC 42001:2023 · 1 control

  • 9.1 Monitoring, measurement, analysis and evaluation
  • 6.1 General concepts
  • ITAR-CompliancProgram-ICP-EmpoweredOfficial-Recordkeeping-5Years-Training-IT-Cloud-SupplyChain-Coord-EAR-OFAC-Wassenaar ITAR Compliance Program + Internal Compliance Program (ICP) + Empowered Official + 5-Year Recordkeeping + Training + IT/Cloud (GovCloud + Azure Gov + GCC High) + Supply Chain + Coord EAR + OFAC + Wassenaar + MTCR

NIST SP 800-30 · 1 control

  • NISTSP30-8 Risk Assessment Maintenance, Continuous Monitoring, and Integration with the RMF

NIST SP 800-37 · 1 control

  • NISTSP37-7 RMF Monitor Step: Continuous Monitoring and Ongoing Authorisation

NIST SP 800-39 · 1 control

  • NISTSP39-5 Risk Monitoring: Effectiveness, Changes, Compliance, and Reassessment Triggers
  • PICSGMP-1 Chapter 1: Pharmaceutical Quality System (PQS) and Quality Risk Management
  • SAEIGHT-7 Management System, Worker Engagement, Continuous Improvement
  • 2.5.2 Verification Activities

South Korea ISMS-P · 1 control

  • ISMSP-MS-04 Management Review and Improvement
  • UKOPRES-5 Third-Party Risk, Concentration Risk

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Performance evaluation – ISO 9001:2015

Query this from an agent

The graph holds this control, the 67 it maps to, and the evidence behind each claim, over MCP and REST.