ISO 9001:2015
Performance evaluation – ISO 9001:2015

ISO 9001:2015 9.3.1: General

What does 9.3.1 require?

At planned intervals top management reviews the QMS to confirm that it remains suitable, adequate and effective and that it stays aligned with where the organization is heading strategically.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 67 controls across 46 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 22000:2018 · 5 controls

  • 10.1 Nonconformity and corrective action
  • 9.3 Management review
  • 9.3.1 General
  • 9.3.2 Management review input
  • 9.3.3 Management review output

ISO 37301:2021 · 4 controls

  • 9.3 Management review
  • 9.3.1 Management review: general
  • 9.3.2 Management review inputs
  • 9.3.3 Management review results

ISO 27001:2022 · 3 controls

  • 9.3.1 Management review: general
  • 9.3.2 Management review inputs
  • 9.3.3 Management review results
  • IEC62304-4.1 Quality Management System
  • IEC62304-9.6 Analyze Problems for Trends

ISO 13485:2016 · 2 controls

  • 4.1 General requirements
  • 5.6 Management review

ISO 14004:2016 · 2 controls

  • 8.1.1 General guidance: Operational control
  • 9.3 Management review

ISO 37001:2016 · 2 controls

  • 9.3 9.3 Management review
  • 9.3.1 9.3.1 Top management review

ISO 45001:2018 · 2 controls

  • 10.2 Incident, nonconformity and corrective action
  • 9.3 Management review
  • ISO-17025-8.1 Options
  • ISO-17025-8.7 Corrective actions

ISO/IEC 27003:2017 · 2 controls

  • NFPA1600-7.2 After-Action Reporting
  • NFPA1600-8.2 Corrective Action
  • AS9100D-10.2 Nonconformity and Corrective Action
  • ACQS-8-3 Continuous Improvement
  • DIQ-2 Data Quality Management
  • IS.AR.210 Findings and Corrective Actions

ISO 14001:2015 · 1 control

  • 9.3 Management review
  • ISO-14064-1-8 Quality management of the GHG inventory
  • ISO-20400-6.5 Monitoring and continuous improvement

ISO 21001:2018 · 1 control

ISO 21001:2025 · 1 control

ISO 22301:2019 · 1 control

  • 9.3 Management review

ISO 27005:2022 · 1 control

  • 10.6 Management review

ISO 27701:2019 · 1 control

ISO 30401 · 1 control

  • ISO30401-15 Nonconformity and corrective action
  • ISO-39001-10.1 Nonconformity and corrective action
  • ISO-41001-10.1 Nonconformity and corrective action
  • 9.3 Management review

ISO 55001:2014 · 1 control

  • 9.3 Management review

ISO 56002 · 1 control

  • ISO-56002-10.2 Deviation, nonconformity and corrective action

ISO/IEC 27014:2020 · 1 control

  • 27014-5.6 Continuous improvement

ISO/IEC 42001:2023 · 1 control

  • 9.3 Management review
  • 6.1 General concepts
  • ITAR-CompliancProgram-ICP-EmpoweredOfficial-Recordkeeping-5Years-Training-IT-Cloud-SupplyChain-Coord-EAR-OFAC-Wassenaar ITAR Compliance Program + Internal Compliance Program (ICP) + Empowered Official + 5-Year Recordkeeping + Training + IT/Cloud (GovCloud + Azure Gov + GCC High) + Supply Chain + Coord EAR + OFAC + Wassenaar + MTCR

NIST SP 800-30 · 1 control

  • NISTSP30-8 Risk Assessment Maintenance, Continuous Monitoring, and Integration with the RMF

NIST SP 800-37 · 1 control

  • NISTSP37-7 RMF Monitor Step: Continuous Monitoring and Ongoing Authorisation

NIST SP 800-39 · 1 control

  • NISTSP39-5 Risk Monitoring: Effectiveness, Changes, Compliance, and Reassessment Triggers
  • PICSGMP-1 Chapter 1: Pharmaceutical Quality System (PQS) and Quality Risk Management
  • SAEIGHT-7 Management System, Worker Engagement, Continuous Improvement
  • 2.5.2 Verification Activities

South Korea ISMS-P · 1 control

  • ISMSP-MS-04 Management Review and Improvement
  • UKOPRES-5 Third-Party Risk, Concentration Risk

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Performance evaluation – ISO 9001:2015

Query this from an agent

The graph holds this control, the 67 it maps to, and the evidence behind each claim, over MCP and REST.