Back to Frameworks

ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

Europe (ESA member states and the European space industry)
vECSS-E-ST-10C (6 March 2009); Rev.1 of 15 February 2017 is the current issue
7 domains
41 controls

ECSS system engineering general requirements for European space projects (2009 edition): the system engineering plan, requirement engineering and traceability, analyses and trade-offs, design, budgets and configuration, product verification, integration and control of the technical effort, and the activities and reviews of each project phase.

Verified

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) is a compliance framework from Europe (ESA member states and the European space industry) with 7 domains and 41 controls. The largest domains are Clause 5.2: Requirement engineering – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) (11 controls), Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) (9 controls), Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) (8 controls). Every control below carries what it requires and what an assessor expects to see.

Maintained by Gerard Blokdyk

Framework summaries on this platform are interpretations grounded in the published source, for educational and compliance planning purposes. They do not reproduce or replace the official standards. Refer to the authoritative source for the definitive text. Framework names and trademarks belong to their respective organisations.

Framework Domains (7)

Clause 5.1: System engineering plan – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

1 controls
Controls in the Clause 5.1: System engineering plan – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 1 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.1Produce and maintain a system engineering plan

Clause 5.2: Requirement engineering – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

11 controls
Controls in the Clause 5.2: Requirement engineering – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 11 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.1Analyse customer requirements and derive controlled lower-level requirements
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.2Keep forward and backward traceability of every requirement
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.1Establish consistent technical requirements specifications and a specification tree
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.2Consolidate incomplete, ambiguous or contradictory requirements at the start of each phase
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.3Identify the requirements that drive system risk
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.4Assign verification methods to every requirement and record them in the verification matrix
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.5Allocate system requirements and their verification methods to lower levels
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.6Verify that requirements are consistent and non-redundant across levels
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.7Validate requirements against the expressed needs with the customer in phase 0
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.8Maintain the requirements through to the end of phase F
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.2.3.9Define the documents that form the requirements baseline

Clause 5.3: Analysis – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

4 controls
Controls in the Clause 5.3: Analysis – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 4 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.3.1Perform mission, functional, physical, performance and cost analyses and document them
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.3.2Establish environments, qualification and acceptance criteria, factors and margins
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.3.3Conduct trade-off analyses and report them
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.3.4Define, validate and maintain analysis methods, tools and models

Clause 5.4: Design and configuration – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

7 controls
Controls in the Clause 5.4: Design and configuration – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 7 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.1.1Establish a whole-life system design from architecture, allocation and technology
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.1.2Define, apportion and control technical budgets under the margin policy
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.1.3Define, validate and maintain design methods, tools and models with an agreed coordinate system
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.1.4Maintain the design definition file, the design justification file and the user manual
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.2.1Define the complete configuration at every level and document it
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.2.2Establish configuration baselines at defined milestones
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.4.2.3Define and document the hierarchy and assembly sequence

Clause 5.5: Verification – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

1 controls
Controls in the Clause 5.5: Verification – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 1 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.5Verify the complete product on its defined architecture per ECSS-E-ST-10-02

Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

9 controls
Controls in the Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 9 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.1Define, plan and manage the integrated technical effort
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.2Keep the system engineering plan aligned with the project schedule
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.3Define the engineering data repository and electronic exchange interfaces
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.4Control external and internal interfaces through specifications and interface control documents
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.5Define the coordinate systems and the units system
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.6Control the technical budgets and define the margin policy
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.7Identify, assess and plan candidate technologies
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.8Contribute engineering data and controls to risk management
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::5.6.9Assess every change proposal and nonconformance technically and control agreed actions

Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

8 controls
Controls in the Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) domain of ECSS-E-ST-10C System Engineering General Requirements (2009 edition): 8 controls
CodeTitle
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.2Plan and monitor system engineering activities by project phase and identify critical elements
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.3Phase 0: support need identification and propose system concepts
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.4Phase A: finalise the needs and propose solutions with their risks
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.5Phase B: establish the preliminary definition and demonstrate it meets the requirements
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.6Phase C: establish the detailed definition and demonstrate the capability to meet the specification
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.7Phase D: complete qualification and acceptance and prepare for operations
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.8Phase E: support the launch campaign, operations and anomaly resolution
ecss-e-st-10c-system-engineering-general-requirements-2009-edition::6.9Phase F: support disposal and the Mission Close-out Review

What is ECSS-E-ST-10C System Engineering General Requirements (2009 edition) and who does it apply to?

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) is a compliance framework from Europe (ESA member states and the European space industry) with 7 domains and 41 controls. ECSS system engineering general requirements for European space projects (2009 edition): the system engineering plan, requirement engineering and traceability, analyses and trade-offs, design, budgets and configuration, product verification, integration and control of the technical effort, and the activities and reviews of each project phase. It is used by organisations to establish and maintain compliance with industry standards and regulatory requirements.

What does ECSS-E-ST-10C System Engineering General Requirements (2009 edition) actually require?

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) has 41 controls organised across 7 domains. The largest domains are Clause 5.2: Requirement engineering – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) (11 controls), Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) (9 controls), Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition) (8 controls). Each control defines specific requirements that organisations must implement to achieve compliance.

If I already comply with another framework, how much of ECSS-E-ST-10C System Engineering General Requirements (2009 edition) do I already cover?

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) does not currently have cross-framework mappings in our system. Check back as we continuously expand our mapping database.

How do I implement ECSS-E-ST-10C System Engineering General Requirements (2009 edition)?

Start your ECSS-E-ST-10C System Engineering General Requirements (2009 edition) compliance journey by running a self-assessment on our platform to identify your current compliance posture. Our AI advisory can answer specific questions about ECSS-E-ST-10C System Engineering General Requirements (2009 edition) requirements, and cross-framework mapping helps you leverage existing controls from other frameworks you may already comply with. Create a free account to access all 41 controls and track your progress.

Start Your Compliance Journey

Create a free account to run self-assessments, get AI advisory, and track your compliance progress across 1,248 frameworks.

Get Started Free →

Free forever, no credit card required