Clause 5.4: Design and configuration – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 5.4.2.2: Establish configuration baselines at defined milestones

What does 5.4.2.2 require?

System engineering within the supplier establishes the system configuration baselines and the project milestones at which each comes under control.

Maintained by Gerard Blokdyk

Other controls in Clause 5.4: Design and configuration – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)