System engineering within the supplier carries agreed requirement changes into the system and lower-level specifications and keeps maintaining the requirements across the whole life cycle, down to the Mission Close-out Review that ends phase F.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.