ECSS-E-ST-10C System Engineering General Requirements (2009 edition)
Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 5.6.9: Assess every change proposal and nonconformance technically and control agreed actions

What does 5.6.9 require?

The supplier gives a technical assessment of every proposal to change the product baseline and of every nonconformance against the product's status, and implements and controls the actions agreed.

Maintained by Gerard Blokdyk

Other controls in Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.