ECSS-E-ST-10C System Engineering General Requirements (2009 edition)
Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 6.5: Phase B: establish the preliminary definition and demonstrate it meets the requirements

What does 6.5 require?

In phase B the supplier's system engineering function establishes the preliminary definition of the system for the solution selected at the end of phase A, demonstrates that this solution satisfies the technical requirements within the schedule, budget, target cost and organisational requirements, supports the System Requirements Review and the Preliminary Design Review, and sees that their actions are implemented.

Maintained by Gerard Blokdyk

Other controls in Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.