ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 5.4.1.2: Define, apportion and control technical budgets under the margin policy

What does 5.4.1.2 require?

The team responsible for system engineering defines and maintains every technical budget of the system (mass, power, data, pointing and the like) with its target, current status and trend, apportions and controls budget requirements down every level of the decomposition, and applies the margin policy set in the system engineering plan.