Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 5.6.7: Identify, assess and plan candidate technologies

What does 5.6.7 require?

The engineering organisation identifies the candidate technologies and records them in a technology matrix, has the proposed technologies assessed and confirmed for availability and maturity against the technology readiness levels defined in the standard and documented in a technology plan, and shows that they can be supported and are feasible within the cost and schedule constraints of the industrial organisation.

Maintained by Gerard Blokdyk

Other controls in Clause 5.6: System engineering integration and control – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.