ECSS-E-ST-10C System Engineering General Requirements (2009 edition)
Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 6.8: Phase E: support the launch campaign, operations and anomaly resolution

What does 6.8 require?

In phase E the supplier's system engineering function supports the launch campaign, supports the entity running operations and utilisation under the terms of a business agreement, supports the Flight Readiness, Operational Readiness, Launch Readiness, Commissioning Result and End-of-Life Reviews and the acceptance reviews of recurring products and sees that their actions are implemented, and carries out the system engineering activities and provides the documents needed for anomaly investigation and resolution.

Maintained by Gerard Blokdyk

Other controls in Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.