ECSS-E-ST-10C System Engineering General Requirements (2009 edition)
Clause 6: System engineering activities by project phase – ECSS-E-ST-10C System Engineering General Requirements (2009 edition)

ECSS-E-ST-10C System Engineering General Requirements (2009 edition) 6.6: Phase C: establish the detailed definition and demonstrate the capability to meet the specification

What does 6.6 require?

In phase C the supplier's system engineering function establishes the detailed definition of the system, demonstrates that it can satisfy the system technical requirements specification, supports the Critical Design Review and sees that its actions are implemented.