ISO 22000:2018
Performance evaluation – ISO 22000:2018

ISO 22000:2018 9.3.1: General

What does 9.3.1 require?

On a planned schedule, top management examines the FSMS as a whole and concludes whether it is still suitable, adequate and effective for the organization.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 28 controls across 15 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 37301:2021 · 4 controls

  • 9.3 Management review
  • 9.3.1 Management review: general
  • 9.3.2 Management review inputs
  • 9.3.3 Management review results

ISO 9001:2015 · 4 controls

  • 9.3 Management review
  • 9.3.1 General
  • 9.3.2 Management review inputs
  • 9.3.3 Management review outputs

ISO 27001:2022 · 3 controls

  • 9.3.1 Management review: general
  • 9.3.2 Management review inputs
  • 9.3.3 Management review results

ISO 13485:2016 · 2 controls

  • 4.1 General requirements
  • 5.6 Management review

ISO 14004:2016 · 2 controls

  • 8.1.1 General guidance: Operational control
  • 9.3 Management review

ISO 37001:2016 · 2 controls

  • 9.3 9.3 Management review
  • 9.3.1 9.3.1 Top management review

ISO 14001:2015 · 1 control

  • 9.3 Management review

ISO 22301:2019 · 1 control

  • 9.3 Management review

ISO 27005:2022 · 1 control

  • 10.6 Management review

ISO 27701:2019 · 1 control

ISO 45001:2018 · 1 control

  • 9.3 Management review
  • 9.3 Management review

ISO 55001:2014 · 1 control

  • 9.3 Management review

ISO/IEC 42001:2023 · 1 control

  • 9.3 Management review
  • 6.1 General concepts

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Performance evaluation – ISO 22000:2018

Query this from an agent

The graph holds this control, the 28 it maps to, and the evidence behind each claim, over MCP and REST.