ISO 9001:2015
Operation – ISO 9001:2015

ISO 9001:2015 8.1: Operational planning and control

The organization plans, carries out and controls the processes required to meet the requirements for supplying its products and services and to put into effect the actions from clause 6. It does so by identifying the requirements for those products and services; setting criteria both for the processes and for accepting the products and services; identifying the resources required to make them conform; controlling the processes against the criteria; and identifying, keeping and retaining the documented information needed to show conformity and to give confidence the processes ran as planned. The planning output must suit how the organization operates. Planned changes are controlled, the consequences of unplanned changes are reviewed, and outsourced processes are kept under control.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 33 controls across 21 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

COBIT 2019 · 2 controls

  • APO11.03 APO11.03 Manage quality standards, practices and procedures and integrate quality management into key processes and solutions
  • BAI11.05 BAI11.05 Manage project quality

ISO 21001:2018 · 2 controls

  • 8.1.1 8.1.1 General
  • 8.1.2 8.1.2 Specific operational planning and control of educational products and services

ISO 21001:2025 · 2 controls

  • 8.1.1 8.1.1 General
  • 8.1.2 8.1.2 Specific operational planning and control of educational products and services
  • ISO-22313-8.1 Operational planning and control
  • ISO22313-8.1 Guidance on operational planning and control

ISO 27701:2019 · 2 controls

  • 5.6.1 Operational planning and control
  • 8.1 General

ISO 30401 · 2 controls

  • ISO30401-06 Operational planning and control
  • ISO30401-8.1 Operational planning and control
  • ISO-39001-8.1 Operational planning and control
  • ISO39001-8.1 Operational Planning and Control
  • ISO-41001-8.1 Operational planning and control
  • ISO41001-8.1 Operational Planning and Control
  • ISO-50001-8.1 Operational planning and control
  • 8.1 Operational planning and control

ISO 56002 · 2 controls

  • ISO-56002-8.1 Operational planning and control
  • ISO56002-8.1 Operational planning and control

ISO/IEC 27003:2017 · 2 controls

  • 27003-8.1 Operational Planning and Control
  • ISO27003-8.1 Operational planning and control
  • AS9100D-8.1 Operational Planning and Control

ISO 14001:2015 · 1 control

  • 8.1 Operational planning and control

ISO 14004:2016 · 1 control

  • 8.1 Operational planning and control

ISO 22000:2018 · 1 control

  • 8.1 Operational planning and control

ISO 22301:2019 · 1 control

  • 8.1 Operational planning and control

ISO 37001:2016 · 1 control

  • 8.1 8.1 Operational planning and control

ISO 37301:2021 · 1 control

  • 8.1 Operational planning and control

ISO 45001:2018 · 1 control

  • 8.1 Operational planning and control

ISO 55001:2014 · 1 control

  • 8.1 Operational planning and control

ISO/IEC 42001:2023 · 1 control

  • 8.1 Operational planning and control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Operation – ISO 9001:2015

Query this from an agent

The graph holds this control, the 33 it maps to, and the evidence behind each claim, over MCP and REST.