ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 3:5.3.5: 5.3.5 Establish the delivery team's mobilization plan

What does 3:5.3.5 require?

The prospective lead appointed party draws up the mobilization plan to be carried out under 5.5, setting the approach, dates and owners for: testing and documenting the production methods and procedures; trial exchanges between task teams; trial exchanges with the appointing party; proving the CDE and access to the shared information and resources; buying, installing, configuring and testing any additional software, hardware and IT infrastructure; creating additional shared resources; education or training to build capability; recruiting task teams or members to reach capacity; and supporting organizations or individuals who join part way through the appointment.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.1 Operational planning and control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-3:2020 operational phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)